Rather than protecting only a single floor edge, Qore PSS encapsulates four vertical construction stages simultaneously, creating an uninterrupted factory-like environment at 100+ meters altitude.
Provides a solid 2.0m tall windbreak barrier shielding steel fixers and formwork carpenters from high-altitude gusts, maintaining precision plumb lines.
100% sealed perimeter prevents wet concrete splatter, vibration tool slips, and aggregate debris from escaping the building footprint.
Dedicated enclosed work floor for post-tensioned tendon stressing, column curing inspections, and exterior facade MEP bracket preparation.
Suspended under-slab catwalk allowing early stripping of slab props and recovery of reusable cast-in climbing anchor shoes in complete safety.

Guarantees complete worker fall arrest and debris containment across all high-wind exposure zones.
Every Qore Perimeter Safety Screen undergoes rigorous computational fluid dynamics (CFD) and structural load simulations to guarantee absolute stability against hurricane-force gusts.

Micro-perforated galvanized steel mesh reduces wind velocity by over 60%, maintaining structural stability in extreme coastal weather.
Heavy-duty reusable anchor shoes bolt directly into cast-in slab sleeves, transferring wind overturning moments into the core slab.
Synchronized dual-circuit hydraulic cylinders lift multi-ton screen assemblies 3.0 meters vertically in a single controlled operation.
Completely autonomous hydraulic self-climbing frees tower cranes for rebar bundles, concrete buckets, and material logistics.
Completely decoupled from crane availability. The synchronized hydraulic manifold allows a 2-man crew to climb an entire floor perimeter in less than 30 minutes.

Our computerized hydraulic pumping stations distribute equalized fluid pressure across multiple climbing cylinders simultaneously. This prevents torque twist, ensuring smooth vertical movement even under gusty atmospheric conditions.
Upper climbing shoes are securely bolted to cast-in slab anchor inserts on the latest cured floor slab.
Synchronized hydraulic cylinders extend their stroke, elevating the vertical guide rail 3.0 meters upward.
Heavy mechanical gravity pawls automatically engage into the rail slots, preventing any downward slippage.
The hydraulic cylinder stroke retracts, pulling the full 4-tier perimeter screen and trailing deck into place.
Engineered with standardized modular frames that adapt seamlessly to irregular high-rise floorplates, cantilevered balconies, and facade step-backs.

All vertical guide tracks and heavy structural shoes are manufactured using automated multi-axis robotic welding jigs, guaranteeing full penetration welds that resist severe cyclical wind buffeting.
Standard planar enclosure modules engineered for high-speed continuous vertical climbing along straight high-rise shear walls and flat slab edges.
Custom-engineered corner and multi-angle connection modules configured to enclose 90° column edges, cantilevers, balconies, and curved architectural facades.
Hanging under-slab work platforms suspended below the screen, providing secure access for soffit formwork stripping, anchor retrieval, and facade inspection.
A side-by-side engineering comparison illustrating why tier-one developers are replacing conventional safety nets with fully enclosed self-climbing perimeter screens.

Provide your structural CAD elevations and building footprint. Our engineering team will model a customized auto-climbing safety screen layout and wind resistance report.