Qore Formwork Manufacturing and Quality Control Protocol Facility

Protocol

The Qore standard for advanced robotic fabrication, millimetric quality assurance, and synchronized 4-day monolithic floor cycles.

Home/Protocol
Manufacturing Protocol

10-Stage Plant Quality Assurance

Every component manufactured across our Mau (UP) and Rajkot (Gujarat) facilities passes through ten rigorous quality checkpoints to guarantee 300+ structural reuse cycles.

Automated Robotic Welding Cell in Qore Formwork Plant
DINSE Robotic Torch System
Automated Manufacturing Standard

Robotic Precision & High-Tensile Joint Integrity

Robotic welding cells and CNC laser cutting ensure uniform weld penetration and exact diagonal dimensions. This eliminates on-site hammering, leaks, and manual modifications.

±0.1 mmHole Tolerance
300+Pour Cycles
100%Traceability
01Grade 6061-T6

Extrusion Alloy Verification

Validating Grade 6061-T6 structural aluminium purity, yield strength (260 MPa), and dimensional geometry.

02±0.1 mm Laser

CNC Laser Cutting & Punching

High-speed laser cutting and multi-axis CNC punching of pin holes at ±0.1mm tolerance to ensure seamless alignment.

0360 kN/m² Hydrostatic

Robotic MIG Argon Welding

Deep-penetration seam welding under inert argon shields, building joint load resistance tested to 60 kN/m².

04Zero Spatter

Surface Spatter De-burring

Automated abrasive grinding and mechanical polishing to eliminate weld spatters for architectural fair-faced concrete.

05Laser Inspection

100% Dimensional Inspection

Laser diagonal and length verification across all manufactured panels before progressing to protective coating.

06Zero Oil-Canning

Automated Hydraulic Leveling

Calibrated roller leveling to eliminate internal residual stresses and guarantee oil-canning-free panel flatness.

07Protective Barrier

Anti-Alkaline Protective Lacquer

Applying oven-cured chemical barrier coating to protect aluminium from concrete slurry corrosion and ease stripping.

08Digital Serialization

Barcode Serialization & RFID

Laser-etched QR and barcode serial tags on every panel for end-to-end cloud inventory tracking from factory to site.

0922 kg/m² Target

Manual-Handling Weight Audit

Ensuring structural panels maintain target weight under 22 kg/m² for effortless manual handling by a 2-man crew.

10Sealed Dispatch

Weather-Sealed Export Packaging

Strapped steel-palletized packaging wrapped in protective bubble film to ensure arrival in factory-fresh condition.

Standard Operating Procedures

Site Execution & Quality Rigor

Standardized on-site protocols developed across 700+ projects to protect concrete finishes, guarantee worker safety, and preserve formwork longevity.

Full Scale 1:1 Pre-Assembly Trial Mock-Up in Factory
Mandatory Pre-Shipment Trial
Quality Milestone // 1:1 TEST ERECTION

Zero-Mismatch Pre-Assembly Guarantee

Before any container leaves our warehouse, our quality engineers construct a complete 1:1 trial mockup of your project's critical structural rooms. Pin connections, corner wedges, and beam props are physically verified under laser plumb inspection.

100% FitZero on-site modification
±1.0 mmLaser plumb tolerance
SOP 01Standard Protocol

Handling & Horizontal Stacking

Strict protocols governing on-site transport, crane hoisting, and horizontal stacking to prevent impact deformation.

Maintain maximum vertical stack limit of 20 panels per bay
Use protective neoprene edge guards between layers
Avoid direct steel-to-aluminium abrasive contact during lifting
SOP 02Standard Protocol

Pre-Dispatch 1:1 Trial Mock-Up

Mandatory full-scale test erection of typical room setups at the factory prior to shipment to verify joint tightness and plumbness.

Complete 1:1 physical assembly of representative floor unit
Verify corner alignment under hydraulic test clamps
Laser check plumb and diagonal symmetry to ±1.0 mm
SOP 03Standard Protocol

Color-Coded Coordinate Sorting

Systematic zone mapping to organize panels, beams, and corner ties into labeled staging bays for instantaneous assembly.

Tag each panel with zone, floor, and coordinate codes
Pre-sort room kits on ground level before vertical crane hoist
Match sequence to the 08:00 AM wall installation schedule
SOP 04Standard Protocol

Digital Laser Leveling & Plumb

Establishing exact structural alignment using dual-axis digital lasers and plumb-bob verification prior to casting.

Confirm verticality deviation is less than 2.0 mm per floor
Verify deck prop head locks are fully seated and loaded
Double-check kicker alignments and wall tie rod tension
SOP 05Standard Protocol

Concrete Decalibration & Release Agent

Gentle cleaning using organic concrete dissolvers and non-metallic scrapers to preserve the protective lacquer barrier.

Apply water-soluble non-acidic concrete dissolver
Use only high-density nylon or rubber scrapers
Evenly spray eco-friendly release agent immediately after cleaning
SOP 06Standard Protocol

Systematic De-Shuttering Matrix

Strict time schedules defining exactly when wall panels, deck soffits, and load props can be safely stripped without deflection.

Strip vertical wall and column panels at 12 hours post-pour
Release deck soffits and slab panels at 36 hours post-pour
Retain intermediate structural props in position for 7 to 14 days
Field Execution Cadence

4.5-Day Monolithic Floor Pour Sequence

By eliminating timber cutting, separate column pours, and external plastering, Qore formwork protocols establish a clockwork daily cycle that guarantees fast-track floor turnarounds.

06:00 AM

Wall Layout & Starter Rebar

Marking boundary chalk lines, checking laser offsets, and tying vertical steel rebar on cured slab.

Hour 01–02
08:00 AM

Vertical Wall Shuttering

Simultaneous installation of internal and external wall panels secured with high-tensile pins and wedges.

Hour 03–05
11:00 AM

Beams, Prop Heads & Deck Panels

Erecting drop-head props, mid-beams, and setting deck soffit panels in completed wall zones.

Hour 06–07
01:00 PM

Top Slab Rebar & Safety Handrails

Laying top steel mesh, securing perimeter safety handrails, and sealing panel junctions.

Hour 08–09
03:00 PM

MEP Conduits & Digital Plumb Audit

Installing electrical junction boxes and plumbing sleeves, followed by digital laser verticality sign-off.

Hour 10–11
05:00 PM

The Monolithic Concrete Pour

Simultaneous continuous concrete pouring of all walls, columns, slabs, and stairs in one unified pour.

Hour 12
Active Monolithic Floor Pour Site Execution by Qore Formwork
Live Monolithic Slab Execution
Cycle Turnaround4.5 Days / Typical Floor
Zero Cold Joints